Intel’s 916,000-pound shipment is a “cold box,” a self-standing air-processor structure that facilitates the cryogenic technology needed to fabricate semiconductors. The box is 23 feet tall, 20 feet wide, and 280 feet long, nearly the length of a football field. The immense scale of the cold box necessitates a transit process that moves at a “parade pace” of 5-10 miles per hour. Intel is taking over southern Ohio’s roads for the next several weeks and months as it builds its new Ohio One Campus, a $28 billion project to create a 1,000-acre campus with two chip factories and room for more. Calling it the new “Silicon Heartland,” the project will be the first leading-edge semiconductor fab in the American Midwest, and once operational, will get to work on the “Angstrom era” of Intel processes, 20A and beyond.

I don’t know why, but I’ve never thought of the transport logistics involved in building a semiconductor fabrication plant.

  • @PRUSSIA_x86@lemmy.world
    link
    fedilink
    English
    621 days ago

    As excited as I am to see my home city actually growing and gaining national attention, I miss the chill cow-town vibes. Traffic is only gonna get worse from here.

    • partial_accumen
      link
      fedilink
      English
      219 days ago

      Columbus will always be growth limited until it gets some goddamn light rail/subway in place.

      • Liz
        link
        fedilink
        English
        219 days ago

        WORLD’S. FASTEST. BULLETTRAIN. NETWORK.