Demand on the Texas power grid is expected to expand so immensely that it would take the equivalent of adding 30 nuclear plants’ worth of electricity by 2030 to meet the needs.
To a significant extent, they do, contracting for construction of generation and transmission (very often renewable), at least at the largest scale.
But, it’s (mostly) all on the grid.
With demand like that, it’s not like there isn’t significant negotiation with the local power company, especially because they’re frequently built a significant distance from existing large power infrastructure.
To a significant extent, they do, contracting for construction of generation and transmission (very often renewable), at least at the largest scale.
But, it’s (mostly) all on the grid.
With demand like that, it’s not like there isn’t significant negotiation with the local power company, especially because they’re frequently built a significant distance from existing large power infrastructure.
Heck, all the big 3 cloud providers signed deals for nuclear generation in the last few months. https://spectrum.ieee.org/nuclear-powered-data-center
Here’s just one more article about these sorts of investments: https://www.canarymedia.com/articles/clean-energy/google-has-a-20b-plan-to-build-data-centers-and-clean-power-together
Subsidized by US taxpayers … If data center flops, we pay hold the defaulted loan
If demand is there, microshit get cheap nuke energy and operator makes profit…
Where is the benefit to the taxpayer?
A few job and chatgpt flooding internet?!
Clown fucking world